We Investigate Alternatives

We Investigate Alternatives

Alternative designs are created and are evaluated based on performance, schedule, cost and risk figures of merit. No design is likely to be best on all figures of merit, so multicriteria decision-aiding techniques should be used to reveal the preferred alternatives. This analysis should be redone whenever more data are available. For example, figures of merit should be computed initially based on estimates by the design engineers. Then, concurrently, models should be constructed and evaluated; simulation data should be derived; and prototypes should be built and measured. Finally, tests should be run on the real system. Alternatives should be judged for compliance of capability against requirements. For the design of complex systems, alternative designs reduce project risk. Investigating innovative alternatives helps clarify the problem statement.

Share this: